JOIN THE NEW TERMINAL ONE TEAM
The New Terminal One invites all vendors to join the bidders list for upcoming Design-Build Contracting Opportunities. Click on the “Prequalify” button below to complete an online Prequalification Questionnaire and upload required financial records and safety documents that provide the team with relevant information concerning your financial health, safety and integrity records.
Table Row | Bid Package | Anticipated Launch Date |
---|---|---|
1 | First Aid Supplies | Q3-Q4 2024 |
2 | General Construction | Q3-Q4 2024 |
3 | Landscaping | Q3-Q4 2024 |
4 | Pest Control | Q3-Q4 2024 |
Bid package launch and proposal due dates are subject to change.
Step 1 |
Step 2 |
Step 3 |
---|---|---|
First time users, create a Building Connected account. Returning users, make sure you are logged in before clicking Prequalify. |
Open the “Qualifications” tab (rubber stamp symbol). Navigate to the Awaiting Submission section and locate the Tishman Construction Corporation questionnaire. |
If you have any questions, email us at [email protected]. |
Prequalification Resources
For your reference, find session recordings and copies of past presentations with information regarding how to complete the prequalification application.
To discuss your capabilities, upcoming packages, and any questions on the prequalification, schedule a virtual or in-person meeting here: https://calendly.com/ntojfk
** Note that AECOM is involved at Terminal 1 (Tishman) and Terminal 6 at JFK Airport (Hunt). There is a separate prequalification per development team. If you are interested in being considered for both projects, do not start the applications simultaneously. Complete 1 first, then start the 2nd, to facilitate the seamless transition of information from one application to the next.
Table Row | Package # | Type | Anticipated Launch | Anticipated Submission | Scope | Description |
---|---|---|---|---|---|---|
1 | GSE-012024 | RFP | Feb-24 | Apr-24 | eGSE POOLING | Supply, management, and maintenance of a pooled all-electric fleet of ground service equipment (“eGSE") |
2 | MAX-022024 | RFP | Mar-24 | Apr-24 | MAXIMO | Enterprise implementation of IBM Maximo. |
3 | GXT-032024 | RFQ | May-24 | May-24 | GUEST EXPERIENCE TRAINING | Develop required training, instructor-led and web-based, for all staff working on The New Terminal One making guest experience and extraordinary moment to remember |
4 | NTO-3PL-RFP-240520 | RFP | May-24 | Aug-24 | THIRD-PARTY LOUNGE OPERATOR | Develop, design, build and operate common use and landside lounges within The New Terminal One. |
5 | NTO-SNWR-NDA-20240521 | RFI | May-24 | May-24 | SNOW REMOVAL SERVICES | Snow removal; expressions of interest and request for NDA. |
6 | NTO-RFP-SNWR-CURB-20240530 | RFP | May-24 | Jul-24 | SNOW REMOVAL - CURBSIDE | Snow and ice removal for NTO controlled areas, including arrival/departure roadways, exterior pathways and uncovered walkable areas. |
7 | NTO-RFP-SNWR-AIR-20240530 | RFP | May-24 | Jul-24 | SNOW REMOVAL - AIRSIDE | Snow and ice removal for NTO controlled areas, including apron/airside areas, service roads, passenger boarding bridge cab/stairs, apron perimeter and sidewalks. |
8 | NTO-RFP-FFE-CBP_TSA-20240712 | RFP | Jul-24 | Aug-24 | FF&E - CBP & TSA | Furnish, install, and commission all Furniture, Fixtures & Equipment (FF&E) and comply with all U.S. Customs and Border Protection (CBP), Transportation Security Administrations (TSA), and applicable Port Authority of New York & New Terminal One approval requirements. |
9 | NTO-RFP-SSP-20240722 | RFP | Jul-24 | Sep-24 | SECURITY SERVICE PROVIDER | NTO is seeking a security services team to support the following areas, but not limited to: Security Operations Center, Security Dispatcher, Curbside Coordinator, Terminal patrols / Alarm response, Employee screening checkpoints, Sally port and loading dock operations (incl K9 screening), Offsite screening facility, Curbside staff, Credentialing Coordinator, etc. |
10 | NTO-RFP-PHB-TOPO-202408 | RFP | Aug-24 | Sep-24 | TOPOGRAPHIC SURVEY & SUBSURFACE UTILITY EXPLORATION | NTO seeks firms to conduct comprehensive topographic and utility surveys. The selected provider will be responsible for conventional and 3D surveys and exploration of the terminal site, including frontages, airfield, and above- and below-ground utility infrastructure. |
11 | NTO-RFP-PHB-GEO-202408 | RFP | Aug-24 | Sep-24 | GEOTECHNICAL INVESTIGATION | NTO seeks firms to perform soil borings below the existing grade and standard penetration and cone penetration testing at the terminal. The work includes locating existing utilities before work and filling in boring locations once testing is complete. |
12 | NTO-RFQ-VALE-202409 | RFQ | Sep-24 | Oct-24 | VALE AND OTHER LOW EMISSIONS GRANT ADMINISTRATION | NTO is seeking the professional services of an environmental consultant to support the preparation and submission of Federal Aviation Administration (FAA) grant applications for the installation of emission reduction devices on the new passenger terminal building. |
13 | NTO-RFP-CUSTODIAL-202410 | RFP | Oct-24 | Jan-25 | CUSTODIAL SERVICES (JANITORIAL, LANDSCAPE MAINTENANCE, PEST CONTROL, WASTE MANAGEMENT) | NTO is seeking firms to provide services for a bundled facilities management contract that includes janitorial, landscaping maintenance, pest control, and waste management services in support of New Terminal One's operations. |
The New Terminal One does not discriminate in employment on the basis of race, color, religion, sex (including pregnancy and gender identity), national origin, political affiliation, sexual orientation, marital status, disability, genetic information, age, membership in an employee organization, retaliation, parental status, military service, or other non-merit factor. We celebrate diversity and are committed to creating an inclusive environment for all employees. We respect and seek to empower each individual and support the diverse cultures, perspectives, skills and experiences within our workforce. For more information on current openings, click the “apply now” button below.
As the exclusive commercial developer and manager of the New Terminal One (NTO) commercial program, URW Airports is committed to lowering barriers to entry and providing technical assistance and support to ensure the program reflects the rich diversity of its communities. With a focus on flexible opportunities for small, local, and minority-owned businesses—from food and beverage and retail to product placement—the team will provide Airport Certified Disadvantaged Business Enterprise (ACDBEs) and Local Business Enterprises (LBEs) with flexible entry points that balance customer preferences and commercial objectives while growing the capacity of local businesses to help them reach their ultimate success.
Register your business today to learn about upcoming opportunities and benefit from networking, events, and invitations to partner.